Buildings Project status: Completed

Stupnik project – building with basement and three floors

Earthworks, reinforced concrete and masonry works · Stupnik

Project details

Location
Stupnik
Building
Building with basement, ground floor and three upper floors
Our works
Earthworks, RC and masonry works
Period
July 2021 – May 2022
Storeys
basement + ground + 3 floors

About the project

Alpha Concretum Gradnja carried out the shell construction works on a building in Stupnik – from excavation and foundations to the reinforced concrete structure and walls on every floor. The building is privately owned by the investor, and the works ran from July 2021 to May 2022.

Earthworks

Construction began with bulk excavation of the topsoil to a depth of approx. 30 cm and excavation for the basement and the 40 cm thick foundation slab. We then supplied, placed and compacted a coarse gravel sub-base as the bed for the foundations.

Concrete and reinforced concrete works

After the blinding concrete, we built the reinforced concrete foundation slab and basement walls, followed by the walls, staircases and floor slabs from the ground floor to the third floor – including the supply, delivery and placing of the concrete.

Masonry works

Finally, we built all the required walls from the ground floor to the third floor.

What we built

  • Bulk excavation of topsoil (approx. 30 cm deep)
  • Excavation for the basement and foundation slab
  • Placing and compacting a coarse gravel sub-base
  • Blinding concrete
  • RC foundation slab and walls
  • Concreting of walls, staircases and floor slabs from ground to third floor
  • Masonry walls from ground to third floor