Building in Stupnik - property owned by investors
-
Investor
Alpha Concretum Gradnja d.o.o. -
Start of work
July 2021 -
End of works
May 2022 -
Works in the project
Earthwork
Concrete and reinforced concrete works
Masonry work
Our role in the project
1. Earthworks
- wide excavation of surface layers of humus with a depth of approx. 30 cm
- wide excavation of material for the basement and foundation slab 40 cm thick
- procurement, transport, filling and tamping of large gravel tampons


2. Concrete and reinforced concrete works
- production of concrete base
- reinforced concrete base plate and walls
- procurement, transport and installation of concrete in walls, staircases and slabs from the ground floor to III. floor
3. Masonry works
- construction of the necessary walls from the ground floor to III. floor