Sljeme cable car project

Project details

Works on the construction of the new Sljeme cable car

  • Investor
    Zagrebački električni tramvaj (ZET)
  • Contractor
    Alpha Concretum Gradnja doo
  • End of works
    November 2020
  • Works in the project
    Construction of a cable car
    Rehabilitation of landslides
    Lower station
    Intermediate station Brestovac

Our role in the project

1. Construction of the Sljeme cable car
Route and landings-foundations and base plate (installation of ribbed reinforcement with a diameter of 12 and 14 mm and larger according to reinforcement drawings for simple and complex reinforcement, production of base plate formwork and machine installation of concrete).

2. Rehabilitation of the landslide of the Sljeme cable car
Head beam and walls (production of base plate formwork, production of wall formwork, installation of reinforcement and machine installation of concrete).

3. Lower station
– reinforcement works: installation of ribbed reinforcement of columns, beams and ceiling of floors -2 and -1
– carpentry works: production, assembly and disassembly of double-sided smooth metal formwork of perimeter walls, walls of staircases and elevators, rectangular columns and beams on levels -2 and -1 with a deviation height of up to 3.60 m
– installation of concrete: slabs, sloped ramp slabs, walls, columns and beams on level -2 and -1

4. Intermediate station Brestovac
– carpentry works: production, assembly and disassembly of double-sided smooth formwork of perimeter walls, walls of staircases and elevators, rectangular columns and beams up to 3.6 m high
– installation of concrete for: reinforced concrete foundation slab, reinforced concrete basement ceiling slab, concreting of walls, basement columns, external staircase and basement beams
– reinforcement works: installation of ribbed reinforcement of columns, walls of floors -2 and -1 and reinforcement of beams and ceilings of floors -2 and -1 according to reinforcement drawings

acg-hr_zicara_sljeme_projekt

5. Upper station
– carpentry works: production, assembly and disassembly of double-sided smooth formwork of perimeter walls, walls of staircases and elevators, rectangular columns and panel formwork
– installation of concrete for: reinforced concrete slab, reinforced concrete ceiling slab, concreting of walls, columns, stairs
– reinforcement works: installation of ribbed reinforcement of columns, walls and ceiling reinforcement according to reinforcement drawings