loading
Prečko M2, Zagreb – armiranobetonska konstrukcija stambeno-poslovne građevine, pogled iz zraka
Buildings Project status: Completed

Prečko M2 – residential and commercial building, Zagreb

Reinforced concrete structure of the basement and upper floors · Jarnovićeva / Lhotkina, Prečko

Project details

Location
Jarnovićeva / Lhotkina, Prečko, Zagreb
Client
GIP Pionir d.o.o.
Building
Residential and commercial building M2
Our works
RC structure of basement and upper floors
Storeys
basement garage + ground + 3 floors

About the project

Alpha Concretum Gradnja built the reinforced concrete structure of the new residential and commercial building M2 in the Prečko neighbourhood of Zagreb for the client GIP Pionir d.o.o.

The works covered the underground garage levels and the above-ground part of the building: load-bearing walls, columns, beams, floor slabs and staircases. A contract addendum extended the above-ground works to the second and third floors. The project is part of stage 2 of phase 1 of the development, and the basement houses the garage of group 2.b.

Basement and foundations

Below ground, we built the garage structure and the foundation slab. The slab works included subgrade preparation, blinding concrete, formwork, reinforcement and concreting, as well as the works around penetrations and joints. Around 105 tonnes of reinforcement were specified for the foundation slab and the wall beneath it alone – a good indication of the scale of the structural works.

Superstructure

Above ground, the works covered the structure of the ground floor and upper floors: RC walls, columns, beams, slabs, staircases, parapet walls and the lift shaft. The floor slabs were built as semi-precast RC slabs with Omnia elements. The original contract covered the ground and first floors; a contract addendum then entrusted us with the structural works on the second and third floors.

The contracted works also included selected roof works: the roof structure, roof insulation, timber boarding and roofing felt, as well as the finishing of service ducts.

What we built

  • RC structure of basement levels (garage)
  • Foundation slab
  • RC walls – formwork, reinforcement and concreting
  • Columns – formwork, reinforcement and concreting
  • Reinforced concrete beams
  • Floor slabs (semi-precast, Omnia)
  • RC staircases
  • Installation of precast RC stair elements
  • Parapet walls
  • Lift shaft structure
  • Ventilation caps
  • Carpentry and associated structural works
  • Working scaffolding, safety barriers and material handling

Site photos

Construction · June 2026

Drone video

Looking for a reliable reinforced concrete contractor?

Get in touch – we will gladly review your project.