Civil engineering Project status: Completed

Landslide remediation on state road DC3 – Jarče Polje

Landslide remediation, drainage and pavement reconstruction · DC3, section 012, km 7+100

Project details

Location
Jarče Polje, state road DC3
Client
Hrvatske ceste d.o.o. (Croatian Roads)
Building
State road DC3 – landslide remediation
Our works
Landslide remediation, drainage and pavement structure
Period
August 2023 – November 2023

About the project

Alpha Concretum Gradnja carried out the remediation of a landslide on state road DC3, section 012 at km 7+100, at Jarče Polje. The client was Hrvatske ceste d.o.o. (Croatian Roads), and the works ran from August to November 2023.

Drainage

After the preparatory works, the existing pavement was removed and the road subgrade was excavated and replaced with new material. A drainage system was built: longitudinal drainage of the state and local road, reconstruction of the drainage ditch and reinforcement of the inlet and outlet structures of the existing culvert.

Slopes and pavement

The embankment slopes of the state and local road were reconstructed, as was the pavement of both roads. To keep traffic moving during the works, we built a road bypass.

What we built

  • Preparatory works
  • Removal of the pavement structure
  • Excavation of the road subgrade and replacement of material
  • Longitudinal drainage of the state and local road
  • Reconstruction of the drainage ditch
  • Reinforcement of the inlet and outlet structures of the existing culvert
  • Reconstruction of the embankment slopes of the state and local road
  • Reconstruction of the pavement of the state and local road
  • Construction of a road bypass

Site photos

Izvedba · 2023.