loading
S.N. kabel Miroševec, Zagreb – kabelski rov uz Miroševečku cestu, pogled iz zraka
Civil engineering Project status: Completed

Medium-voltage cable route in Miroševec – Zagreb

Civil works on the HEP ODS medium-voltage cable network · Miroševečka cesta and Vrbanići

Project details

Location
Miroševečka cesta and Vrbanići, Miroševec, Zagreb
Client
HEP – Operator distribucijskog sustava d.o.o., Elektra Zagreb
Building
Power infrastructure – MV cable network
Our works
Civil works on the cable route
Concrete placed
284 m³

About the project

Alpha Concretum Gradnja carried out the civil works for the construction and reconstruction of the HEP ODS power distribution network in Miroševec, Zagreb – a new medium-voltage cable route with a total length of 1,128 m.

The route runs along the western side of Miroševečka cesta, partly through Vrbanići street to substation TS 1747 and on towards the junction of Miroševečka and Slanovečka cesta. The new underground infrastructure is connected to the existing network and to substation 1TS 1747 Miroševečka 163, which also made it possible to remove part of the overhead network.

Works carried out

The project covered preparation of the route, opening and construction of cable trenches, laying of medium-voltage cables and protective ducts, construction of cable chambers and the civil works needed to take the new infrastructure through existing roads and footpaths. An important part of the job was reinstating all affected surfaces: backfilling and compacting the trenches, sub-base layers, concrete works and renewal of kerbs.

The project in numbers

  • 4,015 m of MV cable laid
  • approx. 2,350 m of HDPE protective ducts (Ø50, Ø110 and Ø200 mm)
  • 857 m³ of excavation and 475 m³ of sub-base placed and compacted
  • 284 m³ of C25/30 concrete placed
  • 2,262 m of machine cutting of asphalt and concrete
  • 15,227 protective bricks and 3 cable chambers

Project challenges

The works were carried out within an existing urban and traffic environment, where infrastructure works had to proceed while keeping access to surrounding properties and protecting existing utilities. The route crosses and runs parallel to other utility networks, which was resolved in detail in the civil design.

Our role

Alpha Concretum Gradnja was the contractor for the civil part of the works – from opening the route and excavating the cable trenches, through preparing and protecting the cables and ducts, to backfilling, compaction and final reinstatement of the affected surfaces.

What we built

  • Machine cutting of asphalt and concrete surfaces
  • Breaking up asphalt and concrete and removal of material
  • Temporary vehicle and pedestrian bridges for property access
  • Machine excavation of cable trenches
  • Sand bedding in the cable trench
  • Backfilling and compaction of cable trenches
  • Laying of medium-voltage cables and supports
  • Protective bricks and warning tape
  • Fe/Zn earthing strip
  • HDPE protective ducts of various diameters
  • Cable chambers
  • Sub-base layers of trafficked surfaces
  • Concrete kerbs
  • Concrete and masonry works
  • Openings through existing masonry structures
  • Ancillary works with machinery and a truck-mounted crane

Site photos

Final stage · June 2026

Drone video

Looking for a reliable reinforced concrete contractor?

Get in touch – we will gladly review your project.

Send us your project