Medium-voltage cable route in Miroševec – Zagreb
Civil works on the HEP ODS medium-voltage cable network · Miroševečka cesta and Vrbanići
Project details
- Location
- Miroševečka cesta and Vrbanići, Miroševec, Zagreb
- Client
- HEP – Operator distribucijskog sustava d.o.o., Elektra Zagreb
- Building
- Power infrastructure – MV cable network
- Our works
- Civil works on the cable route
- Concrete placed
- 284 m³
About the project
Alpha Concretum Gradnja carried out the civil works for the construction and reconstruction of the HEP ODS power distribution network in Miroševec, Zagreb – a new medium-voltage cable route with a total length of 1,128 m.
The route runs along the western side of Miroševečka cesta, partly through Vrbanići street to substation TS 1747 and on towards the junction of Miroševečka and Slanovečka cesta. The new underground infrastructure is connected to the existing network and to substation 1TS 1747 Miroševečka 163, which also made it possible to remove part of the overhead network.
Works carried out
The project covered preparation of the route, opening and construction of cable trenches, laying of medium-voltage cables and protective ducts, construction of cable chambers and the civil works needed to take the new infrastructure through existing roads and footpaths. An important part of the job was reinstating all affected surfaces: backfilling and compacting the trenches, sub-base layers, concrete works and renewal of kerbs.
The project in numbers
- 4,015 m of MV cable laid
- approx. 2,350 m of HDPE protective ducts (Ø50, Ø110 and Ø200 mm)
- 857 m³ of excavation and 475 m³ of sub-base placed and compacted
- 284 m³ of C25/30 concrete placed
- 2,262 m of machine cutting of asphalt and concrete
- 15,227 protective bricks and 3 cable chambers
Project challenges
The works were carried out within an existing urban and traffic environment, where infrastructure works had to proceed while keeping access to surrounding properties and protecting existing utilities. The route crosses and runs parallel to other utility networks, which was resolved in detail in the civil design.
Our role
Alpha Concretum Gradnja was the contractor for the civil part of the works – from opening the route and excavating the cable trenches, through preparing and protecting the cables and ducts, to backfilling, compaction and final reinstatement of the affected surfaces.
What we built
- Machine cutting of asphalt and concrete surfaces
- Breaking up asphalt and concrete and removal of material
- Temporary vehicle and pedestrian bridges for property access
- Machine excavation of cable trenches
- Sand bedding in the cable trench
- Backfilling and compaction of cable trenches
- Laying of medium-voltage cables and supports
- Protective bricks and warning tape
- Fe/Zn earthing strip
- HDPE protective ducts of various diameters
- Cable chambers
- Sub-base layers of trafficked surfaces
- Concrete kerbs
- Concrete and masonry works
- Openings through existing masonry structures
- Ancillary works with machinery and a truck-mounted crane
Drone video
Looking for a reliable reinforced concrete contractor?
Get in touch – we will gladly review your project.
Other projects
Sljeme cable car – stations and tower foundations, Zagreb
Landslide remediation on state road DC3 – Jarče Polje
Karlovac expressway – Sajevac, Jelaši and Slunjska brda viaducts
Civil Protection training ground – Jastrebarsko
ATJ Lučko – car park and external works
Švarča stream regulation – Karlovac
Špansko North D – residential building, Zagreb
Stupnik project – building with basement and three floors